|
|
1. The following will be used for installing the Triad Dam Gates®: A. Gate Bottom Gasket; B. Gate Top; C. Spring Clip; D. Installation Tool. |
2. The hole dimension on the pipe should measure 1.25" wide and between 2.625" and 3.325" long. |
|
|
3. Insert the tool into the back of the gate bottom gasket. |
4. Turn the tool over so that the front side of the gate bottom gasket faces up. |
|
|
5. Insert the gate bottom basket into the hole. |
6. Make sure the front side of the gate bottom gasket faces up through the hole. |
|
|
7. Using the tool to hold the gate bottom gasket, place the gate top onto the gate bottom gasket. |
8. Snap the spring clip into place and remove the tool. |